all Long Lead AE Injectors in my truck?? - Diesel Truck Forum - TheDieselGarage.com
Thread Details Posted by SICKS-O, this thread has received 5 replies and been viewed 463 times.

 
LinkBack Thread Tools Display Modes
post #1 of 6 (permalink) Old 01-03-2007, 11:18 PM Thread Starter
Slow 6.0
 
Join Date: Dec 2008
Location: Salem, NH
Posts: 1,554
Points: 42,523
Thanks: 30
Thanked 59 Times in 46 Posts
all Long Lead AE Injectors in my truck??

well i just pulled off the drivers side valve cover on my 99 psd to do glow plugs and to my surprise all four injectors have the AE code and LL on them. the AE/LL injector was only for cylinder 8 right? i cant see how it can be good for performance to have them in every cylinder. can some one elaborate on why it would be like this? all i can think of is a replacement AE/LL injector is cheaper then a normal one so someone thought they would just go ahead and replace them all with them. :shrug:

2006 F350 XLT 4x4
ARP Studs, Blocked EGR Cooler, MBRP 304SS Cool Duals, 03 Turbo, Coolant Filter Kit, PCM Flashed Back & Innovative Extreme Tunes - 13.3 @ 99
SICKS-O is offline  
Sponsored Links
Advertisement
 
post #2 of 6 (permalink) Old 01-03-2007, 11:48 PM
Senior Member
 
CSIPSD's Avatar
 
Join Date: Sep 2005
Location: Bend OR
Posts: 6,337
Points: 55,142
Thanks: 19
Thanked 78 Times in 70 Posts
I cant see why anyone would do that? there not any cheaper... Are you sure? can you post a pic of the top?

01 F-250 SC PSD,210k,16 Isspro Gauges, AFE-2,CCV Mod,IAH delete,map reg,Modded H2e, 6.0 IC, GTS Hybrid injectors, Studs, 910 Valve springs, Forged rods Water injection,Swamps tuned, MBRP 4" dual's, Aero, 6" tip's, 100 axl tank, 4" Revtek lift, 37-14.50-17 TOYO MT's 469hp and 1068tq...

Best Auto Insurance | Auto Protection Today | FREE Trade-In Quote
CSIPSD is offline  
post #3 of 6 (permalink) Old 01-04-2007, 12:20 AM Thread Starter
Slow 6.0
Threadstarter
 
Join Date: Dec 2008
Location: Salem, NH
Posts: 1,554
Points: 42,523
Thanks: 30
Thanked 59 Times in 46 Posts
i just put the valve cover back on but the tops are all identical they say REMAN then AEblahblahblahblah and LL on the bottom. weird right? could this be the reason for my extremely low hpo psi problem?

2006 F350 XLT 4x4
ARP Studs, Blocked EGR Cooler, MBRP 304SS Cool Duals, 03 Turbo, Coolant Filter Kit, PCM Flashed Back & Innovative Extreme Tunes - 13.3 @ 99
SICKS-O is offline  
post #4 of 6 (permalink) Old 01-04-2007, 12:24 AM
 
Join Date: Dec 2008
Posts: 1,870
Points: 12,001
Thanks: 0
Thanked 1 Time in 1 Post
Man that would piss me off. Find out who sold you the truck and kick em in the nutz.
gregrob is offline  
post #5 of 6 (permalink) Old 01-04-2007, 12:31 AM
Senior Member
 
CSIPSD's Avatar
 
Join Date: Sep 2005
Location: Bend OR
Posts: 6,337
Points: 55,142
Thanks: 19
Thanked 78 Times in 70 Posts
I would doubt it, I would say someone got a bunch of remaned LL returns... I doubt they are still LL injectors, just LL cores

01 F-250 SC PSD,210k,16 Isspro Gauges, AFE-2,CCV Mod,IAH delete,map reg,Modded H2e, 6.0 IC, GTS Hybrid injectors, Studs, 910 Valve springs, Forged rods Water injection,Swamps tuned, MBRP 4" dual's, Aero, 6" tip's, 100 axl tank, 4" Revtek lift, 37-14.50-17 TOYO MT's 469hp and 1068tq...

Best Auto Insurance | Auto Protection Today | FREE Trade-In Quote
CSIPSD is offline  
post #6 of 6 (permalink) Old 01-04-2007, 02:30 AM Thread Starter
Slow 6.0
Threadstarter
 
Join Date: Dec 2008
Location: Salem, NH
Posts: 1,554
Points: 42,523
Thanks: 30
Thanked 59 Times in 46 Posts
i dunno how i would know without taking them apart or something? i dunno im thinking of just going with some single stage I 160ccs from bean.

2006 F350 XLT 4x4
ARP Studs, Blocked EGR Cooler, MBRP 304SS Cool Duals, 03 Turbo, Coolant Filter Kit, PCM Flashed Back & Innovative Extreme Tunes - 13.3 @ 99
SICKS-O is offline  
Reply

Quick Reply
Message:
Options

Register Now



In order to be able to post messages on the Diesel Truck Forum - TheDieselGarage.com forums, you must first register.
Please enter your desired user name, your email address and other required details in the form below.

User Name:
Password
Please enter a password for your user account. Note that passwords are case-sensitive.

Password:


Confirm Password:
Email Address
Please enter a valid email address for yourself.

Email Address:
OR

Log-in










Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page
Display Modes
Linear Mode Linear Mode



Posting Rules  
You may post new threads
You may post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

 
For the best viewing experience please update your browser to Google Chrome